PLANNED MAINTENANCE
Winter check-up: reach the peak with your machines in shape
November and December are the busiest months for packaging, labels and commercial print, and the Christmas shutdown follows right after. A planned check now costs less than downtime at the worst moment.
Why now
- During the peak every hour of downtime weighs more on deliveries and margins
- Over the Christmas shutdown machines stand still for days: cold and humidity test rollers, paper and circuits
- Planning now lets you choose date and technician instead of searching in an emergency
- The service report states what to do now and what can wait, by priority
What gets checked
Examples of checks, to be adapted to the machine, model and manufacturer manual:
Sheetfed offset
- Rollers: condition, hardness and stripe setting
- Lubrication and levels as per manual
- Grippers, gripper bars and transfer cylinders
- Feeder and delivery: vacuum, pumps and blowers
- Dampening, cooling and filters
Die-cutters and folder-gluers
- Chains and gripper bars
- Cutting plate and counter plate
- Register and die-cutting pressure
- Belts, gluers and glue inspection systems
- Light barriers and safety devices
Guillotines
- Knife and cutting stick
- Clamp and hydraulic circuit
- Backgauge accuracy
- Test of light barriers and two-hand control
Flexo and labels
- Anilox, doctor blades and ink chambers
- Web tension and guiding
- UV/LED and hot-air dryers
- Rotary die-cutting and matrix waste
Bindery and finishing
- Folding rollers and knives
- Stitching heads and feeders
- Milling and glue tanks on perfect binders
- Laminator temperatures
Before and after the Christmas shutdown
- Cleaning of units, rollers and circuits before the stop
- Protecting paper and board from cold and humidity
- Controlled restart in January, checking safety devices and settings
How it works
- 1Register for free
Add your machines with brand, model and year.
- 2Activate hours
Choose a prepaid hour package: for a check-up on one or two machines the Start package is usually enough.
- 3Open a request
Choose the maintenance service, write “Winter check-up” and give the dates when the machine can stop.
- 4Service report
The verified technician carries out the checks and issues the PDF report with priorities.
What it costs
The check-up uses REPANOW package hours at the published price: the actual working hours plus the travel hours set for your zone are deducted from the package; unused hours stay available until the package expires. Duration depends on the machine and its condition and is agreed before the job.
The check-up does not replace the maintenance required by the manufacturer. For machines under warranty or a manufacturer contract, check its terms first. Technician availability and dates depend on the area and are confirmed in the request.
FOR BUSINESSES
Need a machine fixed?
Register for free, choose an hour package and find the right technician for your machine.
Request serviceFOR TECHNICIANS
Are you a specialist technician?
Join for free in one minute and receive requests matching your expertise.
Join as a technician